Currently: MC MK KAZZINK LLP, Ust-Kamenogorsk. Rep. Kazakhstan. Installation of equipment is completed. Start-up and commissioning works are underway at treatment facilities with a capacity of 700m3/h.

 

JSC “Borovichi Refractories Plant”, Borovichi. The unit “UPR-500” for preparation of 5% solution of lime milk was designed, manufactured and shipped. Productivity – 500 l / h for the finished product. The Customer’s personnel are trained to work. The installation was configured and put into operation in March 2020.

 

LLP “Kazzinc”, Ust-Kamenogorsk, rep. Kazakhstan (customer Kormin LLC). Designed, manufactured and shipped in October 2019, 2 units “UPR-500” with a high degree of automation and with loading tables for the preparation of 4% solutions of magnesium sulfate and sodium hydroxide.

 

LLC “ARCHA” (for the subdivision – Baltasinsky butter-dairy plant, Republic of Tatarstan (customer LLC “Eco-Engineering”)). The unit “UPR-500” for the preparation of a 5% solution of milk of lime was designed, manufactured and shipped in October 2019. Productivity – 500 l / h for the finished product.

 

LLC “Metafrax”, Gubakha. The unit “UPR-500” for preparation of 6.6-12% solution of monocalcium phosphate was designed, manufactured and shipped in October 2019.

 

JSC Izhevsk Electromechanical Plant Kupol, Izhevsk. The URC unit for unloading steel drums and preparation of cyanide solutions (KCN and NaCN) was designed, manufactured and installed. The Customer’s personnel are trained to work. The installation was configured and put into operation in October 2019.

 

IAZ-branch of PJSC “Corporation” IRKUT “, Irkutsk. (Customer LLC “SPbEk”, St. Petersburg). Agreement for the adjustment of design estimates for the reconstruction of industrial wastewater treatment facilities of the galvanic production of the IAZ branch of PJSC IRKUT Corporation. Two-stage design. Development of design documentation for non-standard equipment. Design and estimate documentation was handed over to the Customer in May 2019.

 

Painting production of Mercedes-Benz cars, pos. Esipovo, Moscow region (The customer is “Jayko Russia” LLC). Turnkey contract. Designed, manufactured and installed local treatment facilities (VOC) with a capacity of 10 m3 / h and a water demineralization unit for painting production of Mercedes-Benz cars, with a capacity of 13 m3 / h. The facility was commissioned in May 2019.

 

JSC “123 Aviation Repair Plant” (JSC “123 ARZ”) Staraya Russa, Novgorod Region. Agreement for the development of technical and design estimates for the reconstruction of existing local treatment facilities for industrial wastewater. Integrated design. Additional contract for technical inspection of the production building. Design and estimate documentation was handed over to the Customer in December 2018. May 2019 The project has passed the State Expertise.

 

OOO NPP TekhMash, Udmurt Republic, Izhevsk. Contract for the design of industrial wastewater treatment facilities for LLC LADA Izhevsk, with a capacity of 2,150 m3 / day. Design documentation was handed over to the Customer in December 2018. The project has passed the examination.

 

LLC Guardian Group, rep. Mari El, Yoshkar-Ola. Contract for the design of treatment facilities for a galvanic shop with a capacity of 5 m3 / hour. Two-stage design. Design documentation was handed over to the Customer in December 2018. An agreement has been concluded for the assembly, installation, adjustment of treatment facilities.

 

Cracking Catalyst LLP, Shymkent, rep. Kazakhstan. Designed, manufactured and installed “Unit for dissolving caustic soda URKS-1000”. The productivity of the Node is 15000 l / 12 h of a 46% solution of caustic soda (caustic soda). The Customer’s personnel are trained to work. The node was configured and put into operation in November 2018.

 

JSC “Novosibirsk Instrument-Making Plant”, Novosibirsk. Agreement for the development of a project for the reconstruction of local wastewater treatment facilities for electroplating production, with a capacity of 9.5 m3 / hour. Two-stage design. Design and estimate documentation was handed over to the Customer in November 2018.

 

LLC “ALVIDPROF”, Smolensk. Contract for the development of design documentation for treatment facilities for anodizing line with a capacity of 9.5 m3 / hour. Design documentation was handed over to the Customer in October 2018.

 

JSC Ryazan Plant of Metal-Ceramic Instruments, Ryazan Contract for the technical re-equipment of the local treatment facilities (LOS) of JSC RZMKP, with a capacity of 20 m3 / hour for wash water.

RAO Ryazan Plant of Metal-Ceramic Instruments, Ryazan Contract for the technical re-equipment of local treatment facilities (LOS) of JSC RZMKP, with a capacity of 20 m3 / hour for wash water. Design documentation was handed over to the Customer in July 2018. An agreement has been concluded for the assembly, assembly, and adjustment of VOCs.

 

MC MK KAZZINK LLP, Ust-Kamenogorsk. Rep. Kazakhstan. (Customer “TAUSTROYPROEKT” LLP, Republic of Kazakhstan). Contract for the development of design documentation “Improvement of the water circulation system of MC MK KAZZINK LLP”. Reconstruction of wastewater treatment plants. 1st stage “. OS productivity – 700m3 / hour. Working draft. Two-stage design. Design documentation was handed over to the Customer in December 2017.

 

JSC “Research Institute” Ferrit-Domain “, St. Petersburg. Works on the repair of treatment facilities of the microgalvanization section (replacement and piping of two storage tanks with new ones made of polypropylene, replacement of the sewage supply pipeline, installation and adjustment of the shut-off valve control cabinet, repair and adjustment of the evaporator unit, replacement of loads in pressure filters with removal for disposal of used loads and etc.). The work was completed in December 2017.

 

State Unitary Enterprise “Petersburg Metro”, St. Petersburg, depot “Nevskoe”, galvanic section of the joint workshops. Under the contract (the result of a competitive selection) with the State Unitary Enterprise “Petersburg Metro”, an examination of the circulating water supply system of the galvanic section (treatment facilities) was carried out to determine the technical condition and assess the possibility of further trouble-free operation or the need for its restoration. Developed and provided to the Customer: a technical report with proposals on the need for reconstruction of treatment facilities, recommendations for further operation and maintenance of treatment facilities, a conclusion on the reuse of treated waste water in flushing operations of the galvanic site, operating procedures for the circulating water supply system of the galvanic site. The work was completed in October 2017.

 

JSC “PPO EVT im. V.A. Revunova ”, Penza (for JSC“ GRPZ ”Ryazan). Under the supply agreement, the equipment of three Demineralized Water Preparation Units with a capacity of 3.5 m3 / h (70 m3 / day) each was designed, manufactured, supplied and installed for a new galvanic coating shop under construction at GRPZ JSC. The Units are supplied with water from the technical water supply. Water quality after the water treatment plant – GOST 9.314-90 category 3 (distilled water). Equipment of the Plants (3 pcs.) Were delivered to the customer and installed in October 2017 Commissioning – February 2018

LLC “Steel Sheet Galvanized Nizhegorodskaya”, Mtsensk. Water treatment unit with a capacity of 3.5 m3 / h (70 m3 / day) for the Line for the application of polymer coatings under construction. The water quality after the water treatment unit is GOST 9.314-90 category 2. The scope of work performed: design, manufacture, supply, installation and commissioning. The water treatment unit was commissioned in July 2017.

 

CJSC PO “Spetsavtomatika”, Biysk, Altai Territory. Wastewater treatment plant for industrial waste water at the galvanic site. Two-stage design, assembly, assembly, commissioning. The design documentation was handed over to the Customer. Equipment delivery completed. LLC “Kvant Mineral” carried out installation supervision and commissioning. The treatment facilities were commissioned in June 2017.

 

Concern OJSC “PVO” ALMAZ-ANTEY “Branch No. 2. The plant in Kirov (Customer – HC “STANKOINVEST”, St. Petersburg). Treatment facilities for galvanic effluents in buildings 112 and 135 (new construction). Two-stage design, assembly, installation supervision, commissioning. The design documentation was handed over to the Customer in 2015. The treatment facilities were put into operation in the summer of 2017.

 

JSC “Dedal-NV”, Sergiev Posad, Moscow region. Treatment facilities for anodizing line. Two-stage design. Water treatment unit for anodizing line. April 2017 – the design documentation was handed over to the Customer. An agreement has been concluded for the assembly, installation, adjustment of equipment. November 2017 – complete set. The beginning of installation work is December 2017. Commissioning – 1st quarter 2018/

 

ZAO NPK Geotechnology, Petropavlovsk-Kamchatsky. Mine water treatment facilities for the object “Development of the Shanuch deposit, taking into account the involvement of additional reserves.” Kamchatka Krai. Design documentation for two stages. Design documentation was handed over to the Customer in November 2016. The project has passed the examination. Design documentation for metal structures and non-standard equipment has been developed.

 

KBE XXI Century JSC, Sarapul, Udmurt Republic (Customer – LK-Project LLC, Izhevsk) Reconstruction of the galvanic section and the section for the treatment of galvanic wastewater, manuf. 3.9 m3 / h. Project documentation. Design documentation was handed over to the Customer in March 2016. Construction is underway. housing. The construction of treatment facilities has been suspended.

 

LLC “Baikalrud”, Chita. Mine water treatment facilities for the Noyon-Tologoi deposit. Zabaykalsky Krai. Design documentation for two stages. Design documentation was handed over to the Customer in January 2016. The project has passed the examination.

 

ZAO Alvid, Smolensk. Wastewater treatment plant for anodizing line, with a capacity of 15 m3 / hour. Two-stage design. Design work was carried out in the summer of 2015. Development of working documentation was postponed by the Customer.

 

Plant No. 9, Yekaterinburg (Customer LLC GalvanoChrome, St. Petersburg). Wastewater treatment facilities for galvanic production with the return of treated water to the production cycle. One-step design. Design documentation was handed over to the Customer in autumn 2015.

 

OJSC “Izhmashproekt” Izhevsk, Rep. Udmurtia. (for the Republic of Venezuela). Working documentation for wastewater treatment plants of the cartridge plant, manuf. 21 m3 / hour. Design documentation was handed over to the Customer in September 2015.

 

JSC “Instrument plant” Tenzor “, Dubna, Moscow region. Reconstruction of industrial wastewater treatment facilities with a capacity of 8.2 m3 / hour. Two-stage design, assembly, assembly, commissioning. The design documentation was handed over to the Customer. Under the terms of the contract, the reconstruction is carried out without stopping production in three stages. 2014 – installation and commissioning of the first (chrome recovery unit) and second (neutralization unit) phases were completed. Summer 2015 – installation and commissioning of the third stage (waste water post-treatment unit) was completed. OS were put into operation in autumn 2015

 

JSC “NPP” Kaluga Instrument-Making Plant “TAIFUN”, Kaluga Technical re-equipment of industrial wastewater treatment facilities with a capacity of 25 m3 / hour. Two-stage design, equipment, assembly, commissioning. The design documentation was handed over to the Customer. Under the terms of the contract, the reconstruction is carried out without stopping production in three stages. Installation and commissioning of the first (chrome recovery unit) and the second (neutralization unit) phases were completed. May 2015 installation and commissioning of the third stage (post-treatment unit) was completed. The facility was commissioned in 2015.

 

LLC “Salskselmash” Rostov region. Wastewater treatment plant for galvanic production with a capacity of 4.5 m3 / hour (New construction). Two-stage design, assembly, assembly, commissioning. The design documentation was handed over to the Customer. Completion, installation and commissioning have been completed. The facility was commissioned in June 2015.

 

Voronezh Mechanical Plant OJSC, Voronezh (Customer: Polyplast LLC, Pskov.) Local wastewater treatment facility (WWTP) for a mechanized line for chemical processing of cast aluminum billets and etching of charge materials. Design documentation has been developed. Completed: equipment supply, assembly and commissioning. The facility was commissioned in June 2015.

JSC NPP “Raduga”, St. Petersburg. Wastewater treatment facilities for galvanic production with a capacity of 1.7m3 / hour (New construction). Two-stage design. The design documentation was handed over to the Customer. The construction of treatment facilities is planned for 2016.

 

LLC “Telemechanika”, Nalchik (Customer LLC “Intermix Met”, Moscow “) Treatment facilities of the galvanizing line of galvanic production, manuf. 3.2 m3 / h. (New construction). Two-stage design, assembly, assembly, commissioning. The facility was commissioned in September 2014.

 

JSC 123 ARZ, Staraya Russa, Novgorod region (Customer LLC PF SPEKTR, Pskov) Line for neutralization of cyanide-containing effluents from galvanic production. Project, equipment supply, adjustment. The facility was commissioned in January 2014.

 

OOO “RUSDRAGMET” Moscow (Customer OOO “Klen” Chukotka Autonomous Okrug) Station for additional treatment of circulating water from the settling pond of solutions of the ZIF and tailing dump of GPK Klen, with a capacity of 7 m3 / hour. The design documentation was handed over to the Customer. August 2014 The project passed the examination.

 

FSUE “NIIEFA im. D.V. Efremov “St. Petersburg. Alkaline wash water neutralization unit, manuf. 2.1 m3 / shift. Project, equipment, assembly, adjustment. The facility was commissioned in September 2013.

 

JSC NPO Rubicon-Innovation, Smolensk. Wastewater treatment plant for electroplating and printed circuit boards, with a capacity of 2 m3 / day. Two-stage design. The design documentation was handed over to the Customer in August 2013, the facility was put into operation.

 

CJSC SINETIC, Novosibirsk (for facilities in Sochi, Corporation Olympstroy). 2013 Manufactured and shipped to the Customer 6 sets “Unit for the preparation of reagents UPR-500”, designed for the safe preparation of solutions from a dry product. The productivity of UPR-500 is 500 l / h for the finished product.

 

OOO GlavResurs, St. Petersburg (for facilities in Sochi, Corporation Olympstroy). 2013 Manufactured and shipped 3 sets of “Unit for the preparation of reagents UPR-500”. The productivity of UPR-500 is 500 l / h for the finished product.

 

JSC “20 ARZ”, Pushkin Len. Region (Customer LLC “NTK” PROCESS “, St. Petersburg). A set of equipment “Unit for sorption additional treatment USD-250” manufactured and shipped. 250 l / h. for the station of neutralization of waste water of galvanic production. The facility was commissioned in December 2012.

 

LLC “Galsar”, Saratov. Post-treatment unit for wastewater treatment plants of galvanic production in Bryansk, manuf. 3 m3 / hour. Completed: working design, equipment supply, assembly, commissioning. Design documentation was handed over to the Customer in August 2012. The facility was commissioned in February 2014.

 

KAZZINK LLP, Ust-Kamenogorsk, Republic of Kazakhstan. (Customer LLC “KORMIN” Moscow) 2012 Manufactured, shipped, assembled and launched at the Customer’s site a set of equipment for technological tests for the treatment of industrial wastewater “Installation of sorption additional treatment USD-250”, manuf. 250 l / h.

 

FSUE NPO Impulse, St. Petersburg. Manufactured and put into operation “Unit for the preparation of reagents UPR-500”, intended for the safe preparation of a solution of lime milk of a given concentration from slaked lime powder. The purpose of the finished product is a reagent for use at a wastewater neutralization station for galvanic production and the production of printed circuit boards of the Customer. The productivity of UPR-500 is 500 l / h for the finished product.

 

LLC “Salavatmetall” Salavat, Rep. Bashkartostan. (Customer IEF “Egast-XXI century” LLC, Ufa)

Detailed design of a station for neutralization of spent pickling solutions of the production of hot-dip galvanizing coatings. Neutralization station productivity 64 m3 / month. Design documentation was handed over to the Customer in April 2012.

 

OJSC NPP KP Kvant Rostov-on-Don. Wastewater treatment plant for galvanic production, with a capacity of 4 m3 / hour. Scope of work performed: working design, equipment, assembly and commissioning. Design documentation was handed over to the Customer in November 2011. The facility was commissioned in 2013.

 

ZAO Okulovsky Furniture Accessories Plant, Okulovka, Novgorod Region. Reconstruction of wastewater treatment facilities for galvanic production, with a capacity of 6 m3 / hour. Scope of work: detailed design, field supervision, adjustment. Design documentation was handed over to the Customer in June 2012. The facility was commissioned in 2013.

 

ZAO Zolotoproekt, Novosibirsk. Mine water treatment plant of the Korbalikhinsky polymetallic mine in the Altai Territory. Station productivity 900 m3 / hour. Scope of work performed: design documentation, field supervision, adjustment. The design documentation was handed over to the Customer in December 2011. The facility was commissioned in July 2014.

 

LLC “Auto-Grad”, Dimitrovgrad, Ulyanovsk region. Detailed design of wastewater treatment facilities for electroplating production, manuf. 6 m3 / hour. The design documentation was handed over to the Customer in 2011. The Customer constructed a building for treatment facilities. Planned construction of treatment facilities – 2015-2016.

 

LLC “Stroyinvestengineering SU-848” Moscow (for the Republic of Venezuela). Detailed design of treatment facilities for industrial effluents of the cartridge plant 21 m3 / hour. Design documentation was handed over to the Customer in June 2011.

 

FSUE OKB “Fakel”, Kaliningrad. Post-treatment station for household, industrial and drainage and storm wastewater of the enterprise. Prod. stations – 18 m3 / hour. Detailed design, field supervision, adjustment. Design documentation was handed over to the Customer in May 2011. The facility was commissioned in February 2013.

 

CJSC “PromExTrading”, St. Petersburg. Project of technical re-equipment of the system for receiving, storing and dosing caustic soda of the Sludge Treatment Complex. The design documentation has passed the industrial safety examination.

 

JSC “OTV SA”, St. Petersburg. Design and construction of a unit for receiving, storing and supplying hydrochloric acid and sodium hydroxide. The design documentation has passed the industrial safety examination. The object was put into operation.

 

NTF “Sudotechnologiya”, St. Petersburg. Development of an organizational and technological project for a typical specialized production of chemical and galvanic coatings of ship parts and products in compliance with international requirements for environmental protection and safety of working conditions in terms of the wastewater treatment system. Design documentation was handed over to the Customer in February 2010.

 

Trial Ltd., Serpukhov, Moscow region. Wastewater treatment plant of the metal coating section 1 m3 / hour. Detailed design, field supervision, adjustment. Design documentation was handed over to the Customer in December 2010. The facility was commissioned in September 2013.

 

JSC “Eltra”, Rzhev, Tver region Detailed design and construction of treatment facilities for waste solutions and rinsing waters of galvanic production 8 m3 / hour. Design documentation was handed over to the Customer in October 2010. The facility was put into operation in the summer of 2013.

CJSC “RosStroyProekt”, St. Petersburg. Project of disinfection technology for household waste water in an infectious diseases hospital for 600 beds in St. Petersburg. The project has passed the state expertise.

 

OJSC “Research Institute” Ferrit-Domen “, St. Petersburg. Design and construction of local treatment facilities for rinsing water and waste solutions of microgalvanic areas, chemical processing of photomasks, chemical processing. Prod. treatment facilities 0.2 m3 / hour. The object was put into operation.

 

PJSC “Priboy”, St. Petersburg. Design and construction of local treatment facilities for the assembly and flushing of radiators. The capacity of the treatment plant is 120 l / day. The object was put into operation.

 

OJSC “Izhmashproekt” Izhevsk, Rep. Udmurtia. (for the Republic of Venezuela). Detailed design of wastewater treatment facilities for galvanic coating areas, painting of a mechanical assembly building, as well as a casting area for a mechanical blanking building and KIS with a capacity of 26 m3 / hour. Design documentation was handed over to the Customer in February 2010. The project has passed the state expertise.

 

JSC “TsKBA”, Tula. 2010 A set of equipment for the sorption purification of rinsing waters of galvanic production was manufactured and shipped – the unit for sorption additional purification USD-250 production. 250 l / h.

 

LLC “Perm Chemical Company”, Perm. 2009 Two wastewater treatment plants (USD-250) were manufactured, shipped, assembled and put into production.

 

Automobile plant “NISSAN”, St. Petersburg. Local Wastewater treatment facilities of the technological center for the production and painting of cars with a capacity of 50 m3 / hour. Scope of work performed: working project, field supervision, adjustment. The facility was commissioned in 2009

 

JSC “Shipbuilding plant” Severnaya Verf “, St. Petersburg. Design documentation for wastewater treatment facilities and surface runoff of the enterprise. The design documentation was handed over to the Customer in 2007. The documentation passed all approvals. Construction has been suspended.

 

LLC “Electroconnect”, Novosibirsk. Reconstruction of treatment facilities for waste solutions and rinsing waters of the printed circuit board production shop, manuf. 20 m3 / hour. Scope of work performed: detailed design, equipment, field supervision, adjustment. The facility was commissioned in 2009

 

LLC “PP” Elhim “, St. Petersburg. Wastewater treatment plants for galvanic production, manuf. 2m3 / hour. Scope of work performed: working design, delivery, commissioning. The facility was commissioned by the Customer in 2008.

 

OOO NPF Praktik, Dzerzhinsk, Nizhny Novgorod region Treatment facilities for galvanic production, with a capacity of 16 m3 / hour. Scope of work performed: working project, design documentation for non-standard equipment (pressure filter, sump, sludge compactor). The design documentation was handed over to the Customer in 2007. Construction was suspended.

 

LLC “ITC Corporation” ESKM “Krasnodar. Treatment facilities of shops: hot-dip galvanized; coloring; electroplated coatings, manuf. 7 m3 / hour. Scope of work performed: detailed design, equipment, adjustment. The design documentation was handed over to the Customer in 2007. The facility was commissioned by the Customer.

 

OJSC 275 AviaRepair Plant, Krasnodar. Treatment facilities of galvanic waste water 5 m3 / hour. Scope of work performed: detailed design, equipment, field supervision, adjustment. The facility was put into operation in 2007.

 

OAO RPK-Vysotsk LUKOIL-II Leningrad Region Station for deferrization of natural waters 192 m3 / day Scope of work performed: working design, equipment, assembly, commissioning. The facility was commissioned in 2007.

 

JSC “GOZ Obukhovsky plant”, St. Petersburg. Treatment facilities of galvanic waste water 60 m3 / hour. Scope of work performed: detailed design, equipment, field supervision, adjustment. The facility was put into operation in 2007.

 

JSC “Nizhegorodsky Machine-Building Plant”, N-Novgorod. Post-treatment block for galvanic waste water with a capacity of 50 m3 / h. Project. The documentation was handed over to the Customer in 2007. Construction was suspended.

 

 